We designed, supplied and installed a temporary industrial warehouse structure, covering a total of 3,500 square metres to provide the end client with a huge amount of additional storage space. Construction of the main building took approximately 2 months and it is expected to remain in situ for up to 10 years, throughout which time Mar-Key Group will continue to maintain the structure.
Coverage: 3,500 sq meters
Structure width: 25m
Leg height: 8m
Location: Oxfordshire
The structure is finished with sheet metal cladding to provide a durable, long-term storage solution. This temporary industrial warehouse is also complete with 7 metre wide roller shutter doors to allow for easy access and goods movement.
The structure was manufactured completely in-house using our own aluminium profiles, and we also manufactured the thermo-inflatable roofs and blew them up with our bespoke air pump system (the only temporary structure manufacturer to do this in-house in the UK!).
Speaking on our recent project, Managing Director Phil Grenville-Hunt commented ‘We’re thrilled to have been able to have supplied to this client and showcase our industrial capabilities. We faced some challenges along the way but the team really pulled together to deliver a fantastic temporary warehouse.’
View our temporary storage structure page or get in touch.
Originally a loading canopy, as our client’s business evolved, so did our structure.
View case studyWe delivered three identical, insulated workshops, accounting for an additional 900 sqm of space.
View case studyWe delivered an impressive 4,500sqm of temporary port warehousing, working to a tight build schedule and signing off three weeks later.
View case studyOur retail client did not have enough storage space ahead of their busiest period. We designed a suitable solution for them.
View case studyBeing manufactured in Britain, we are able to offer significant flexibility in our design and turnaround times, leading to delivery in just 4 weeks!
View case study