Our client originally purchased a temporary loading canopy for pallet storage. A year down the line however, their business requirements changed, and they now needed a warehouse extension.
Fortunately, our modular structures are designed to evolve with your business’ needs.
We presented the option to enclose their pre-existing 27 x 22.5 x 6m structure with matching single-skin steel cladding and installation of a roller shutter door and essential fire exit points.
Our client was keen to take advantage of our solution having already seen the capability of our team.
With the structure already in situ and not changing shape or size, the new project did not require additional planning permission. Nevertheless, we conducted an inspection to ensure appropriate safety measures.
Once we had revisited the site in Witham, both parties were confident to proceed with the latest additions.
For our team to complete a transformation from loading canopy to warehouse, the job required retrofitting of extra framework to accept the installation of cladding. Thereafter, we were able to easily install panels, an electric roller door and both single and double fire doors.
Should our team be required to breakdown the structure, relocate, ot even add additional bays in future, our structures continue to evolve as your business does.
If you require additional space and are seeking a dynamic solution that can evolve in line with your business nees, get in touch with our expert team today.
We erected a loading bay structure in less than 7 days, measuring 27m x 22.5m depth to provide valuable storage space for pallets.
View case studyWe delivered an impressive 45,000sqm of temporary port warehousing, working to a tight build schedule and signing off three weeks later.
View case studyWe designed, supplied and installed a temporary industrial warehouse structure to provide storage space, covering a total of 3,500sqm.
View case studyAn Essex-based business needed to add temporary storage space to their site quickly whilst redevelopment of their head office took place.
View case studyLovehoney has grown massively in a decade and has overgrown itself, hence the client required more space.
View case studyCookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |