Our client originally purchased a temporary loading canopy for pallet storage. A year down the line however, their business requirements changed, and they now needed a warehouse extension.
Fortunately, our modular structures are designed to evolve with your business’ needs.
We presented the option to enclose their pre-existing 27 x 22.5 x 6m structure with matching single-skin steel cladding and installation of a roller shutter door and essential fire exit points.
Our client was keen to take advantage of our solution having already seen the capability of our team.
With the structure already in situ and not changing shape or size, the new project did not require additional planning permission. Nevertheless, we conducted an inspection to ensure appropriate safety measures.
Once we had revisited the site in Witham, both parties were confident to proceed with the latest additions.
For our team to complete a transformation from loading canopy to warehouse, the job required retrofitting of extra framework to accept the installation of cladding. Thereafter, we were able to easily install panels, an electric roller door and both single and double fire doors.
Should our team be required to remove, relocate, or even add additional bays in future, our structures continue to evolve as your business does.
If you require additional space and are seeking a dynamic solution that can evolve in line with your business needs, get in touch with our expert team today.
01202 577 111
We delivered an impressive 4,500sqm of temporary port warehousing, working to a tight build schedule and signing off three weeks later.
View case studyWe delivered three identical, insulated workshops, accounting for an additional 900 sqm of space.
View case studyThe bespoke warehouse design covers exactly 550 sqm, consisting of a 20m x 30m frame with 5m x 10m cut-out.
View case studyWe designed, supplied and installed a temporary industrial warehouse structure to provide storage space, covering a total of 3,500sqm.
View case studyLovehoney has grown massively in a decade and has overgrown itself, hence the client required more space.
View case study