Due to expanding, our client was looking to add some additional storage to their operation and there was nothing available close by to their premises. They did however, have some space at the rear of their offices which was being underutilised.
We manufactured them a 10m x 30m fully insulated structure and installed it with a 6m leg, an electric roller shutter, a single exit door and a double exit door. We also included sky lights to give our client as much natural daylight as possible.
The 6m height gave them the possibility to install pallet racking, to utilise the space as much as possible and the electric roller door allowed them to easily bring in their forklift in/out of the building. To fit in with the client’s needs, the structure was installed on specific days across a 3-week period and will be there indefinitely. Visit our Semi-Permanent storage page to find out more,
We designed, supplied and installed a temporary industrial warehouse structure to provide storage space, covering a total of 3,500sqm.
View case studyBeing manufactured in Britain, we are able to offer significant flexibility in our design and turnaround times, leading to delivery in just 4 weeks!
View case studyWe delivered three identical, insulated workshops, accounting for an additional 900 sqm of space.
View case studyWe delivered an impressive 4,500sqm of temporary port warehousing, working to a tight build schedule and signing off three weeks later.
View case studyOur retail client did not have enough storage space ahead of their busiest period. We designed a suitable solution for them.
View case study