Case Study
Airport extension


We were approached by CORMAC to install a semi-permanent structure to the airport building to make way for a new café area for customers.

Airport extension
cafe extension
airport extension
glazed cafe

Brief and Solution


With a very limited and varying-width construction space available, this project called for us to design and manufacture a completely bespoke solution for this semi-permanent café.

Almost triangular in shape, the building goes from 1.5m at one end to 9m at the other.

This attaches to the existing building for a seamless customer experience. The structure required insulation to maintain a comfortable environment for staff and passersby.

Receiving full structural sign off, the building had been fitted out to become a fully working airport café, and can remain in situ for 25+ years if required.