The Tower Hotel is a 4 star hotel located on the banks of the river Thames who recently approached Mar-Key Group. The brief was to provide additional dining space during peak winter months in the form of a temporary restaurant.
Our 6m x 17m structure with bespoke entrance provides the hotel with a whole new area to offer as an outside dining and bar space with fantastic views over the river and the iconic bridge. The structure needed to sit sympathetically with it’s surroundings so the timber cladding and brown PVC was the ideal solution.
Taking 5 team members just 2 days to install, the hotel had the space dressed in no time and ready for trading.
We are proud to have worked with many local companies. View our bespoke retail structures page.
The Tower Hotel Manager Bechir commented:
‘I would like to personally thank you and your team especially Craig and Andy for their support with the purchase and installation of the marquee. All team were very hard working, professional and have good customer skills. The marquee was completed on time and from my point of view was executed and completed in a very professional way.
The marquee is now a big hit and is in full swing with passer-by’s and guests alike, including the hotel staff, hotel general manager and the company operations director.
Mar-Key came across as a very professional company and with the excellent team you have this gives you a very good name so I would not hesitate in recommending you to other hotels.’
We were chosen to deliver a temporary retail store, to provide additional trading space whilst the main store underwent refurbishment.
View case studyWe were chosen to deliver a home and away changing room facility to Saracens RFC whilst a new stand and changing room were constructed.
View case studyWe designed, supplied and installed a temporary industrial warehouse structure to provide storage space, covering a total of 3,500sqm.
View case studyWe designed and installed a 25m x 40m, curved-roof structure to house an ice rink and skate hire area over the Christmas period in the Chiltern Hills.
View case studyHighcliffe School required additional space for their 6th Form students. We created a 60sqm building that blended seamlessly with existing facilities.
View case studyCookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |