We were asked to deliver a lean-to warehouse extension for a major retail business who were about to install an automated picking system at their main facility, which would take 2-3 years to complete. It was imperative that they could continue business as usual until they were ready to fully occupy their refurbished warehouse again.
This project was delivered in a number of phases in line with the client’s needs and to cause minimal disruption to operations. We firstly installed a number of structures on a rental basis for inbound deliveries and returned items. This ensured that valuable stock remained protected at all times and that trading could easily continue.
Secondly, we delivered a 9m x 220m lean-to warehouse structure on a 4m high leg which offered a fantastic amount of temporary space. Our client then installed a concrete pad inside the structure to allow for easy pallet truck movement internally.
Lastly, we installed additional temporary buildings on the oppostite side of the warehouse building to facilitate additional goods movement and storage.
We are proud to have supported with the delivery of this structure which enables the development works and subsequently the growth of a business. the modular nature of our solutions offers fantastic flexibility and allows us to adapt the solution as our clients needs change.
More information on our warehouse structures can be found on our warehouse page.
Need something similar?
01202 577 111
info@mar-key.com
While maintenance of their warehouse took place, we erected a 10m x 40m temporary warehouse to be used as a workshop and for storage of tools.
View case studyWe manufactured this 10m x 30m fully insulated structure to add some additional storage to their operation close by to their premises.
View case studyWe designed, supplied and installed a temporary industrial warehouse structure to provide storage space, covering a total of 3,500sqm.
View case studyAn Essex-based business needed to add temporary storage space to their site quickly whilst redevelopment of their head office took place.
View case studyMar-Key Group were delighted to have won the contract to replace a tired old building used for stores with an up to date and fresh warehouse.
View case studyCookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |