Highcliffe School in Dorset had a requirement for additional space for their 6th Form students due to an increase in pupil numbers. The brief was to find a solution that blended seamlessly with their existing facilities both internally and externally to achieve an extension that felt very much a part of the school.
Our inhouse CAD designer drew up a 3D visual of the initial concept to assist with the client visualising the proposed design, and we worked with our client to refine this to achieve their ideal solution. We supported the school from the initial concept, obtaining planning permission, working with our preferred planning company and producing required visual documentation to support the submission.
The final structure we supplied was a 60 sqm building, utilising our A-frame structure, then using cladding of insulated panels ensuring the colours matched their current building and window design for that all-important designed finish. We employed and liaised with groundworkers and the structural engineers to ensure the foundations were suitable for the structure and compliant with Building Control needs.
All subcontractors were project managed by Mar-Key Group ensuring the client had a one stop shop for the entire project.
We offer bespoke building extensions for the education sector, amongst other sectors.
We designed and installed a 25m x 40m, curved-roof structure to house an ice rink and skate hire area over the Christmas period in the Chiltern Hills.
View case studyHeythrop Park is the perfect location for weddings and occasions. They wanted to expand their venue space to cater for larger capacity bookings.
View case studyWe were chosen to deliver a temporary retail store, to provide additional trading space whilst the main store underwent refurbishment.
View case studyOur 6m x 17m structure with bespoke entrance offers as an outside dining and bar space with fantastic views over the river and the iconic bridge.
View case studyWith existing facilities due to be knocked down, we provided 3 additional temporary spaces for Langley Park School, with minimal disruption.
View case studyCookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |