We were the chosen supplier to deliver a short term solution to house students at school whilst they navigated the RAAC crisis. The building needed to provide a suitable teaching and learning space within their current grounds, and flexibility to reconfigure and remove. A temporary classroom for hire offered the short-term space and adaptability they required to pursue the project.
The brief was for the building works to be complete by the start of November, so that all year groups could return to face-to-face education following half-term, and we delivered.
In conjunction with Star Live we designed and built this turn-key project on schedule and with minimal disruption to the school.
Our delivery included installation of a 20m x 20m insulated semi-permanent building, which in its current configuration consists of four fully-fitted classrooms, each equipped with power and data points.
The structure is secure and with insulated wall panels can be easily heated through the winter months, as well as being reinforced with a thermo-roof and gable.
Our solutions rescued schools like this one from the RAAC crisis with a temporary classroom for hire that is also available for purchase.
We included internal and external lighting, as well as fire and security alarms so that when the building was handed to our client, it was ready to be occupied.
Tables and chairs, cassette block flooring with plywood overlay, glazed windows and steel doors create a pleasant environment suitable for mid- long term use.
To demonstrate the flexibility of temporary structures, we transformed a temporary classroom for hire into a temporary sports hall just a month later. Our team were on hand to help deliver this transition with the removal of all internal walls and equipment to give a larger internal space that will continue to benefit the school, teachers and students until it is no longer required.
Highcliffe School required additional space for their 6th Form students. We created a 60sqm building that blended seamlessly with existing facilities.
View case studyWe delivered a fully-fitted studio for our client located on the site of a local leisure facility to provide additional class space.
View case studyWith existing facilities due to be knocked down, our flexible temporary classroom hire provides a suitable long-term solution during building works.
View case studyAn indoor tennis centre were looking to expand their facilities with a standalone studio, which would provide space to train.
View case study