We installed a 13m x 15m canopy to be used as a cover when loading lorries at a busy distribution centre in Andover, allowing them to continue working whatever the weather.
Our reinforced industrial 220 x 100mm frame has a leg height of 6m allowing lorries to safely pass underneath, and covered a total of 2 bays to maximise loading space and efficiency for our client.
Delivered in just over a day, timing was key as we had to work around our client’s busy schedule to minimise any potential disruption to their service.
All info on temporary storage solutions can be found here.
#MadeInBritain
We built a warehouse lean-to structure for the client that would extend from their warehouse and blend seamlessly with their facilities.
View case studyOur client needed additional space at their warehouse for storage of materials, which we delivered.
View case studyWe were approached by the client to deliver a temporary warehouse on their existing site whilst they upgraded their existing facilities.
View case studyLovehoney has grown massively in a decade and has overgrown itself, hence the client required more space.
View case studyWe erected a loading bay structure in less than 7 days, measuring 27m x 22.5m depth to provide valuable storage space for pallets.
View case study