CASE STUDY Temporary classroom and break-out space
‘Minimal disruption and a fully functioning learning space.’
With existing facilities due to be knocked down, we provided three temporary structures for a High School to provide additional space in the interim until the new buildings were completed.
Our flexible temporary classroom hire enabled our client to make sure that students were able to continue learning for the mid-long term until the new buildings were ready to occupy.
To ensure minimal disruption for students, we provided the following fully functioning spaces:
Chemistry laboratory
Including suitable extraction, gas supply and storage, and a separate area for chemical preparation etc.
Specification:
12m x 9m structure with Cat 2 lighting, entrance hall, store room and prep area for technicians, chemical resistant, raised flooring, good sound insulation from external noise.
Pair of Classrooms
A spacious and light space providing an appropriate working environment for the students.
Specification:
Entrance with locker area, Cat 2 lighting, dedicated store rooms, sturdy raised flooring, good sound insulation between classrooms and from external noise, fire escape in each room.
6th form facilties
This area provides a social break out space for 6th formers and can also be used as a canteen.
Specification:
15m x 20m structure with insulated steel roof and wall panels, glazed door and wall panels on the front.
Flexible hire, flexible finish
We handled all elements of these turn-key installs, installing the temporary buildings with minimal disruption and in just a matter of weeks. Clad and finished to blend with existing facilities, our solution was also build with cost in mind.
From access and fire exits through to dropped ceilings, windows and a bespoke packing system to account for the uneven ground surface, our temporary school buildings successfully created a comfortable learning space for students and an environment conducive to learning.
If you need the full works, we’re experts in creating long term temporary classroom space. We’ll make sure your building blends seamlessly with its surroundings. See what we did here for a Sixth Form in Dorset.
When you choose Mar-Key Group, you don’t need to compromise on quality. Designed, manufactured and delivered to British standards, we have a solution for long and short term use.
If you need something similar, contact us today and we’ll handle your request as a priority: