Temporary Structures for Construction Sites
Temporary structures rarely make it onto the critical path, but get them wrong, and they can hold up a programme as surely as a late materials delivery. Welfare, storage and covered working areas all depend on them, and if they arrive late or in the wrong size, everything that relies on them slips too.
We have been manufacturing temporary structures in Britain since 1991, and the same problems come up again and again. In our experience, this is what we would advise a project manager to have sorted, and when. We cover the wider case in our article on the role of temporary structures in construction projects, so this piece sticks to the practical decisions.
Do you need planning permission or building regulations approval?
These are two separate questions, and the answers depend on the size of the structure, how long it stays and where it goes.
Temporary buildings needed for construction are often covered by permitted development rights while the works are going on. Those rights come with conditions, including taking the structure down and restoring the land afterwards, and they do not apply in every situation. Building regulations have their own exemptions, but a structure is not automatically exempt just because you call it temporary.
Before anything goes into the programme, check these with your local planning authority:
- Floor area and height
- How long it will be on site
- Distance from boundaries and neighbouring properties
- Whether people will be in it, and for how long
- Any site designations, such as a conservation area or listed building
We are happy to talk through what is likely to be needed, but the local planning authority has the final say. A phone call at planning stage costs nothing. Finding out after the structure has been delivered can cost you a week.
Which structure does which job?
Getting this wrong is expensive to fix once it is on site. Most projects need some mix of the following.
| Need | What to look for |
| Site offices and meeting rooms | Clear-span modular buildings that can be laid out to suit and changed as the team grows |
| Welfare units | Toilets, washing and rest areas, sized for your peak headcount |
| Dry, secure materials storage | Enclosed space close to the work, from a single bay to a large building |
| Plant and equipment storage | Wide access for vehicles and machinery |
| Covered working areas | Weather protection so trades keep working through wet weeks |
Think about how the space will be used week to week, not just on day one. A store that works for pallets in June may be the wrong choice for cement and plasterboard in January. Because we design and build in-house, we can adjust insulation, layout, doors and windows to suit the job. Our structures can also be built to meet full UK Part L building regulations if you need something longer-term or insulated.
Is your welfare space sized for the busiest week, not the average one?
Toilets, washing facilities, drinking water, changing space and somewhere to rest and eat are a legal requirement, and they need to be in place before other work can safely start. The principal contractor is responsible for providing them.
It is easy to underestimate this when the workforce grows through the programme. If numbers will rise in later phases, tell us when we first talk, so we can size the space for it or plan to extend it rather than replace it.
On bigger sites, it helps to put offices, welfare and storage together in one area, often called a site village, rather than scattering them wherever there happened to be room. It cuts down on people and materials crossing the site, and makes visitors and deliveries much easier to manage.
Is the ground ready?
A temporary structure is only as good as what it sits on. Ground conditions vary a lot from one site to the next, and the foundation matters as much for a storage building as for an office. Our guide to temporary building foundations covers what we check before installing anything, particularly where heavy plant has already been driving over the ground.
Access matters too. Check that delivery vehicles can reach the position, that there is room for our installation team to work, and that the structure will not block a route you need in the next phase. Moving a building because it is in the way is a waste of everyone’s time.
How far ahead should you talk to us?
Earlier than you think. How long a job takes depends on the size and specification of the structure, the state of the groundwork, and whether any permissions are needed. It is far easier to fit all of that around your programme when we are in the conversation at pre-construction than when earthworks are already underway.
A structure that turns up late does not just delay itself. It delays material deliveries with nowhere to go and trades with no shelter to work under. Tell us your programme dates and we will tell you honestly what is realistic.
Have you thought about security and insurance?
Site storage is a common target for theft, so it is worth deciding what you need to protect before you specify. Tell us what will be kept in the building and we can talk through the options.
Also check who is covering the structure and its contents while it is on site. Your site insurance may not extend to a third-party structure, so confirm this with your insurer before it arrives.
Is your supplier actually cleared to work on your site?
Any temporary structure supplier coming onto your site needs to meet the same bar as every other contractor on your list. Ask for MUTA full supplier status, SafeContractor, CHAS, ISO 9001, ISO 14001 and BSI certification, and be wary of anyone who cannot show you current paperwork when asked. We hold all of them, and you can find the details on our about us page.
What happens to the building when your phase ends?
Construction programmes rarely go exactly to plan, and the structure needs to be able to cope. If you run more than one site, a building that can be taken down, moved and reinstalled across phases or sites is worth much more than one you use once. Ask any supplier what relocation involves, including how long it takes to dismantle and rebuild.
Agree removal at the start too. Who takes it down, how long it takes and what the ground needs to look like afterwards should all be in the programme, especially where a planning condition requires the land to be restored.
A quick checklist before you order
- Purpose and peak numbers confirmed
- Planning and building regulations position checked
- Groundwork and access agreed
- Security and insurance sorted
- Installation and removal timings fitted to the programme
- Supplier accreditations checked
- Supplier involved before mobilisation
Frequently asked questions
Do temporary structures on a construction site need planning permission?
Often not, because permitted development rights can cover structures needed for the works while they last. Conditions apply, so check with your local planning authority before you order.
What welfare facilities does a construction site need?
Toilets, washing facilities, drinking water, changing space and somewhere to rest and eat. The principal contractor is responsible for providing them.
Can a temporary building be moved to another site?
Yes, that is one of the main advantages. Ask about relocation before you commit, so you know what dismantling and rebuilding involves.
Should I hire or buy?
It depends on how long you need the space and whether you will use it again on another project. Tell us your programme, and we will talk through the options.
When should I involve a supplier?
At pre-construction, before the programme is fixed.
Talk to us before the programme is fixed
If you have a site coming up, get in touch with us early. You can also ask for a free site visit, so we can look at the ground, the access and the layout in person. If you want to see the kind of work we do, read what clients say on our testimonials page or browse our case studies.
Request a quote or request a free site visit