For over twenty years we have supported this supermarket giant with their seasonal storage requirements during an operational peak throughout the winter.
The space is needed to safely store increased deliveries and reduce pressure on the internal warehouse, creating a much more manageable work space for staff during one of the busiest periods in the retail calendar.
As the chosen supplier to build additional storage units, we are tasked with erecting temporary structures at over 50 stores all around the UK.
Our team carry out a phased install between September and November, ready for our client to use the temporary structures during December.
This large operation entails complex logistics with site locations ranging from Bournemouth to Bradford and beyond! Every single build is delivered to store-specific requirements, with structures varying in size and specification, ensuring that we meet the exact needs of each location for seasonal storage.
Storage buildings are constructed on existing foundations such as unused parking bays or back of house locations, and do not require any groundworks. Most of our structures are staked to the ground for cost-effective and fast installation, but where this is not possible we use weights on the structure.
Our temporary storage solutions expand our client’s capacity and significantly ease the pressure on their permanent facilities, helping them through an operational peak.
We even designed and manufactured bespoke sliding doors to enable easy cage and pallet movement with no difficult door threshold to have to move over!
Are you a retailer looking for a quick solution during peak trading times? Or perhaps you’re planning to undergo a refurbishment and need a temporary trading building in the meantime. When you work alongside a temporary structure manufacturer like us, you know you’ll get a solution to meet the exact needs of your business.
With existing facilities due to be knocked down, we provided 3 additional temporary spaces for Langley Park School, with minimal disruption.
View case studyWe designed, supplied and installed a temporary industrial warehouse structure to provide storage space, covering a total of 3,500sqm.
View case studyWe were chosen to deliver a temporary retail store, to provide additional trading space whilst the main store underwent refurbishment.
View case studyThis tennis court cover enabled this school to continue to provide use of its sports facility whatever the weather on one of the three courts.
View case studyWe designed and installed a 20m x 30m structure that fitted into a space in the the original Budgens car park whilst the main store was being rebuilt.
View case studyCookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |