Case Study
Goodwood Festival


‘From initial contact through to final delivery of the structures, the communication was excellent.’

Mar-Key Group are contracted to supply a wide range of structures at both Goodwood Festival of Speed and Goodwood Revival. These include a span across all of our product catalogue, including single and double deck structures, both laid to ground and packed up using our in-house packing system. In addition we supply various specifications of structure from soft PVC walling to ABS solid walls and glazing, tack off linings, and high end cladding and timber work.

Max Structure Width: 20M

Max Structure Length: 60M

Structure Build Period: 9 Days

Location: West Sussex